首页 体育内容详情
Fukushima debris removal delayed by another year

Fukushima debris removal delayed by another year

分类:体育

网址:

SEO查询: 爱站网 站长工具

点击直达

皇冠最新登陆网址www.hg108.vip)实时更新发布最新最快的皇冠最新登陆代理线路网址、皇冠最新登陆会员线路网址、皇冠最新备用登录网址、皇冠最新手机版登录网址。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

Telegram美国群www.tel8.vip)是一个Telegram群组分享平台。Telegram美国群包括Telegram美国群、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Telegram美国群为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。
 当前暂无评论,快来抢沙发吧~

发布评论